Verveba Telecom Solutions- Richardson Tx
Nokia Tech-Cellular One New
Build Project- Alexandria, La 4/3/10- 6/10/12
Responsibilities included but not limited to:
Site walk downs
Installation and Commissioning of Nokia FCIA
Cabinets
Added or removed FXCAs per configuration
Installation and dressing GPS antenna to the ice
bridge
Script loading
Ran, stitched, and landed power to the cabinet and
power bay.
Removed old Nortel equipment and all cabling for use
of the footprint for Nokia equipment
Complete site folders when the site is fully
completed.
Velocitel Wireless San Francisco, Ca
Engineering Equipment / Field
Mgr. AT&T Cow Project- Pleasanton, Ca 3/2011- 2/4/12
Responsibilities included but not limited to:
Ordering equipment for AT&T’s Bay Area C.O.W.
project.
Coordinated various General Contractors with
different aspects of the C.O.W. build out.
Keeping detailed Excel spreadsheet s for tracking
finished equipment, new build outs, parts shortages, etc.
Uploaded all documents (EPLs, SDRs, Lease
Agreements, etc.) to the customer’s server for all to review.
Met and kept weekly, monthly, and quarterly
deadlines for Installs, Integration, Deliveries, etc.
Attended weekly/ monthly meetings and conference
calls for reports and financial analysis.
Major and minor alarm clearing.
Site Walk downs and evaluations for new builds or
equipment relocation.
Anything else needed of me at that time.
Brius Telecom Solutions Seattle, Wa
Ericsson Tech Regroom Project-
T- Mobile- Bay Area, Ca 1/2011- 3/2011
Responsibilities included but not limited to:
The T-Mobile Regroom Project-
Moving all GSM sectors into one GSM Cabinet from the
3108 cabinet (T-1s, FUs, etc.)
Rip and replace old 3108 cabinet for new 3206
cabinet. Reconfigure GSM cabinet and call test.
Reload Scripts and reconfigure UMTS cabinet, start
POC test.
Complete Integration Check list.
And Site walks for rip and replace.
Fusion Solutions Dallas, Tx 10-2010- 1/2011
Ericsson Tech- T-Mobile- Las
Vegas Market
Responsibilities included but not limited to:
Installation of Nokia LTE cabinets and power Bay.
(Argus).
Commissioning of Nokia LTE cabinets
Completed site folders
Changing Mechanical Down Tilts using the ATC
Lite program, The value is set to T-Mobile specs and then the
before and after screen shots are captured, Changing sector swaps per
T-Mobile specs using a test phone to verify the sector, and compass to
verify the azimuth. Site walk downs, etc.
Nexius Inc. Virginia Beach, Va 04-2010-
10-2010
Pathing Tech- Clearwire
(Kansas City and New York City Markets
Responsibilities included : Installation of cabins,
Site walk downs Site footprint mapping, pathing and Commissioning of
Redline, Motorola, DragonWave, E Band and BridgeWave equipment. Radio
pathing and alignment, Temporary power Connect, making sure that the radio
is shooting at a proper power and Db level per SDR given, Pictures of site
equipment grounding radios, etc. Completion of the site closet out package
for Clearwire
WAVSYS SOLUTIONS New York, NY 02/2010 –
04-2010
Level 3 Tech ( Denver, CO
Market)
Responsibilities included but not limited to; Second
Carrier add Node B and simple FSME and FSMD installs for the Nokia Flexi
cabinet. Mechanical down tilt settings. Installed an additional
Rectifier for the Flexi cabinet, Commissioned new Flexi
hardware with new software version .279, Call testing
included; verifying scrambling codes, test calling (individually) each
sector, hand in and hand out, text and data tests. Ran Ethernet cable
from Nokia Flexi to the Nortel S12000. Installed, connected Ethernet, and
powered NID for Nortel S12000. Report sent nightly for PM review,
with screen shots, Photos, and site info
FUSION SOLUTIONS Irvine, TX 12/2009 - 02/2010
Level 3 Tech (Bay Area Market)
Responsibilities included but not limited to; Second
carrier add Node B and Simple RAX board additions, Installed
and cabled RUs, FUs and PSU, added and enabled RAX and TX
boards. Commissioning of the Ericsson 3106 and3206 UMTS
cabinet, Loaded Scripts to the IDB. Scramble code verification, Call
Testing (with E911 location test), Data Speed Test. Inside
RF line pluming. Combining 1900 and 850. Quality Assurance (Last site
walk before site turn over), Trouble shot or fixed punch listed sites,
close out packets, photos, Screen shots, Final Handover Packet to Carrier.
MYCOM INTERNATIONAL Miramar, FL 10/2009 -
12/2009
Level 3 Tech ( Seattle Market)
Responsibilities included but not limited to; Adding
additional T-1s for AT&T Lucent Equipment, Installed 8, 10, and 14
shelves NIU boxes, Cell Packs, Hoffman Boxes, and Construction of H- Frame.
Installed and stitched 25 pair, Installed Telect modules, chassis, and 66
blocks. Tested Cat5 jumpers and 25 pair with T-Byrd. Punched down by color
code on Patch panel, and 66 blocks. Performed site walk downs, and
recorded information into EDPs or MOPs
BCI COMMUNICATIONS Chino Hills, CA -
08/2008 - 12/2008
Level 3 Tech (Chicago,
Gainesville, Camden, Indianapolis Markets)
Responsibilities included but not limited to;
Commissioning and installation of Sprint Y Max, Samsung equipment.
Commissioning, T-1 Testing, and clearing alarms for AT&T Ericsson UMTS
(3206 cabinets), signal combining UMTS with 850 and or 1900 UMTS
cabinet re-configurations. Coordinated Site surveys and
footprint placement between BCI and their Carriers Sprint and AT&T
MULTICOM WIRELESS - Las Vegas, NV 07/2007 - 08/2008
Project Manager (Las Vegas
Market)
Responsibilities include: Running seven different
jobs sites, scheduling, meetings, installed drops, DIPs, back bone, dressed
closets, punch downs (110 and 66 block), installed routers and switches,
etc.
COMMUNICATIONS & ELECTRICAL SYSTEMS Las Vegas NV
12/2006 -07/2007
(Las Vegas Market)
Responsibilities include: Pulling and terminating
Cat5 and Cat6 cable, installing security cameras, all VoIP's cable, and
data terminations. Also tested camera system. Experience in setting up and
scaling Test Environment Management Services (TEMS) across the firm as a
horizontal. Experience in
executing these services under TEMS : Environment Creation, Environment
Support and Release Management
Understanding
of complex Environment set up and architecture (Linux, Unix based systems
and different infrastructure tools used to deliver the services) Experience in ITIL Framework and
service management.
S.Com COMMUNICATIONS - Central Valley, CA
01/2006-12/2006
Ericsson RT2 Tech (Sacramento
Market)
Responsibilities include setting bases, and running
A/C Power, Commissioning, Call Testing, and Channel Adds for the Ericsson
3206 and 3106 UMTS cabinets. Coordinated between Ericsson and S.Com for
completed and punch listed sites. Sites walk downs and Quality
Assurance. Final Closeout Packets for sites done the night before.
GOODMAN NETWORKS- Dallas, TX 11/2003- 12/2005
E911 Tech , Quality Assurance
Tech II (Northern California Market)
Responsibilities included, installation,
commissioning, and troubleshooting the LMU and Path master, coordinating
with the Oakland switch for test results, rolling T-1 pairs if needed,
reconfiguring the Path master or LMU when need, for Nokia and Ericsson
cabinets etc. Also included but not limited to site walk downs for
Cingular Wireless; taking pictures, marking equipment footing, allocated
all cards in all positions for each cabinet and Fife rack, running,
marking, and terminating Cat5 cable, testing of Cat5 cable
WIRELESS WERKS - San Jose, CA 10/2003 – 07/2004
Assistant Project Manager
(Seattle Market)
Responsibilities range from Radio adds (Nokia BTS,
City Talk, and Ericsson), Site re-commissioning, coordination with Tower
Crew for Antenna Swap outs and LNA additions, installation of City Talk
expansion and Purcell Power Cabinets for Nokia BTS, and Call Testing, Cat 5
additions, LMU upgraded, T-1 additions, true position installation and
commissioning for Ericsson equipment. T1 Additions, coordination with Tower
Crew for Antenna Swap outs and LNA additions, Call Testing.
S.Com COMMUNICATIONS - San Francisco, CA 02/2002 –
11/2002
Lead Cingular Wireless Field
Tech (Los Angeles Market)
Responsibilities ranged from Installation of Nokia
BTS cabinets (NUS cabinets, and edge upgrades),
commissioning of Nokia equipment and integration of Nokia
BTS equipment into Cingular Wireless
Network, completion of E-folders and BTS files for
review, installation and commissioning of LMUs, troubleshooting link
imbalances.
AT & T Field Tech (New
England Market)
Responsibilities
ranged from Installation of Nokia BTS cabinets (NUS cabinets, and edge
upgrades),
Commissioning of
Nokia equipment and integration of Nokia BTS equipment, and
troubleshooting.
PRESTIGE COMMUNICATIONS - Raleigh, SC 01/2002 –
02/2002
Drive Tester (Las Vegas
Market)
Responsibilities ranged from drive testing using
TEMS Investigation GSM 3.2 program and equipment for
Nokia BTS sites for AWS, checked and reloaded new
branching tables, and new Hardware configuration
Into AWS, co-coordinated hot slides with Nokia and
AWS.
MYCOM INTERNATIONAL - Los Angeles, CA 01/2000 –
02/2002
Nokia BTS Engineer
(Seattle Market)
Responsibilities ranged from installation, testing,
commissioning, power testing, and integrating of Nokia
Ultra site BTS into AWS network, verified azimuths
for correct antenna directions, comprehension of GSM
1900 and TDMA technologies.
NORTEL Networks - Irving, TX 04/1998 – 07/2000
Fiber Installation &
Testing Tech Supervisor (Texas, Seattle, Los Angeles, Arizona, Utah
Markets)
Responsibilities ranged from coordinating
installation, turn-up and commissioning of network elements, Bay framing
top and bottom support, grounding and power connections, installation of
Circuit Packs, control shelves, tributary extension shelves and dense
region extension shelves, seating and population of all operational cards,
STS distribution cabling connections, DS3 Coaxial cables, DS3 Panel
connections
OC-48 Fiber adapter connections, cleaning, routing,
and connection all power to BDFB-power boards,
DWDM assembly couplers and transmit, receiving
shelves, reading EDPS and inventory of all supplied,
Testing of all DS3 connections, cleaning routing and
connection of Fiber Optic cabling. Participated and
Assisted in the planning of hot slides and traffic
cut-over’s with Nortel and its customers.
v
BTS Certified
v
Commissioning Certified
v Integration Certified
|